Technical Support Channels

Incident and query management for dredging tenders and operations.

Help Desk

Technical incidents on site, machinery failures, or inquiries about tender specifications.

Response SLA

Committed response times based on incident criticality in port operations.

  • Critical 2 hours
  • High 4 hours
  • Normal 24 hours
  • Low 48 hours
Service Hours

Coverage for coastal infrastructure projects in Argentina.

  • Monday to Friday: 08:00 – 18:00
  • Saturdays: 09:00 – 13:00
  • 24/7 Emergencies: only for critical incidents on active sites

Documentation and FAQs: Check our knowledge base on dredging procedures, machinery specifications, and tender requirements in the FAQ section.

Frequently asked questions about coastal engineering

Technical answers on dredging, port infrastructure and B2B tenders.

We carry out maintenance and deepening dredging in access channels, basins and docks. We use trailing suction hopper dredgers and cutter suction dredgers for cohesive materials and soft rock. All work complies with Argentine port environmental regulations.

The process includes bathymetric surveys, extraction of sediments from approved banks, controlled hydraulic filling and mechanical compaction. We design beach profiles with stable slopes and drainage systems to prevent future erosion. We work with environmental consultants for each project.

We request the technical specifications document, soil study, dredging plan and project schedule. We evaluate site accessibility, equipment availability and weather conditions. Our engineering team reviews each tender with feasibility criteria and national port regulations.

Yes, we have trailing suction hopper dredgers, long-reach excavators, dump trucks and hydrographic survey equipment. The entire fleet is maintained with ISO certification and is available for projects in ports in Argentina and neighboring countries.

Deadlines depend on the volume of sediment and weather conditions. A 500,000 m³ maintenance dredging can be completed in 8 to 12 weeks. Expansion or land reclamation works usually extend between 6 and 18 months, including preliminary studies and environmental monitoring.

Engineering process

From the initial consultation to the delivery of the work, each stage follows a defined technical protocol.

01
Survey and consultation

Analysis of port needs, preliminary bathymetric study, and review of coastal area plans.

02
Feasibility study

Environmental impact assessment, sediment modeling, and dredging volume calculation.

03
Detailed engineering

Design of docks, breakwaters, and channels; construction drawings and machinery technical specifications.

04
Mobilization and construction

Transport of dredgers, excavators, and drilling equipment; execution of dredging and civil construction.

05
Control and monitoring

Inspection of depths, slope stability, and quality of discharged material during operation.

06
Delivery and documentation

Acceptance certificate, as-built drawings, dredging reports, and port works certification.