Latest project updates and technical inquiries
The access dredging progress report has been approved. Next technical meeting on Friday to review the container terminal schedule.
Project: Quequén Port ExpansionThey request an update of environmental impact studies for artificial nourishment in Mar del Plata. Attach recent bathymetry reports.
Project: Beach RestorationAvailability of the suction dredger for the second phase of the access channel confirmed. Start scheduled for next week.
Project: Bulk TerminalNumerical sediment transport modeling report completed. It is recommended to adjust the location of the submerged groins in the southern sector.
Project: Beach RestorationRequest for specifications for the dredging maintenance tender in the access channel to Quequén Port. Submit technical documentation before closing.
Active tenderClients from the port and coastal sector share their experience with Kingdomofbeach.
“The expansion of the access channel and the new terminal were completed on schedule. The dredging of 2.5 million m³ allowed the reception of larger draft vessels without interrupting existing operations.”
“The recovery of 8 km of coastline with sand replenishment and submerged groins stopped critical erosion. The beach profile has remained stable after two seasons.”
“The 350 m dock and the dredging of the 15 km channel allowed us to operate Panamax vessels without restrictions. The recovery of 40 ha for yards was key for bulk logistics.”
Direct channels for technical inquiries, tenders, and operational coordination.
Leading companies and industry professionals endorse our track record in coastal engineering.
"Kingdomofbeach executed the port access dredging with millimeter precision. They met deadlines even during extreme tides."
"The beach restoration in Mar del Plata exceeded technical expectations. The sediment profile has remained stable after two seasons."
"They coordinated heavy machinery and bathymetric studies without disrupting port operations. A reliable partner for critical works."