Messages and Communications

Latest project updates and technical inquiries

Quequén Port Authority 2 hours ago

The access dredging progress report has been approved. Next technical meeting on Friday to review the container terminal schedule.

Project: Quequén Port Expansion
Buenos Aires Province Infrastructure Ministry Yesterday

They request an update of environmental impact studies for artificial nourishment in Mar del Plata. Attach recent bathymetry reports.

Project: Beach Restoration
Bahía Blanca Port Management Consortium 3 days ago

Availability of the suction dredger for the second phase of the access channel confirmed. Start scheduled for next week.

Project: Bulk Terminal
Coastal Engineering Department 5 days ago

Numerical sediment transport modeling report completed. It is recommended to adjust the location of the submerged groins in the southern sector.

Project: Beach Restoration
National Directorate of Navigable Waterways 1 week ago

Request for specifications for the dredging maintenance tender in the access channel to Quequén Port. Submit technical documentation before closing.

Active tender

Results that endorse our engineering

Clients from the port and coastal sector share their experience with Kingdomofbeach.

Port of Quequén

“The expansion of the access channel and the new terminal were completed on schedule. The dredging of 2.5 million m³ allowed the reception of larger draft vessels without interrupting existing operations.”

— Infrastructure Manager, Port Consortium
Municipality of Mar del Plata

“The recovery of 8 km of coastline with sand replenishment and submerged groins stopped critical erosion. The beach profile has remained stable after two seasons.”

— Director of Coastal Works
Bahía Blanca Terminal

“The 350 m dock and the dredging of the 15 km channel allowed us to operate Panamax vessels without restrictions. The recovery of 40 ha for yards was key for bulk logistics.”

Connections

Direct channels for technical inquiries, tenders, and operational coordination.

Trust in construction

Leading companies and industry professionals endorse our track record in coastal engineering.

4.8 5.0

"Kingdomofbeach executed the port access dredging with millimeter precision. They met deadlines even during extreme tides."

Eng. Roberto Méndez, Director of Port Works, Puerto Quequén Consortium
4.9 5.0

"The beach restoration in Mar del Plata exceeded technical expectations. The sediment profile has remained stable after two seasons."

Lic. Laura Fernández, Environmental Manager, Municipality of General Pueyrredón
4.7 5.0

"They coordinated heavy machinery and bathymetric studies without disrupting port operations. A reliable partner for critical works."

Eng. Carlos Suárez, Head of Infrastructure, Bahía Blanca Terminal
Puerto Quequén
MDP Municipality
BB Terminal
Dragados Arg.
Port Consortium
Cookie settings

We use cookies to keep the site stable, remember basic preferences, and understand which pages are useful. You can accept, reject, or review the settings before continuing.

ES EN